Demolish Test Cell Walls

  • Interior renovation at CAAA Building, an occupied explosive building at NSA Crane, under the Minor Construction Multiple Award Contract
  • Demolition via vertical and horizontal saw cutting of 88 LF of 10’ high x 12” thick reinforced concrete test cell walls containing lead-based paint and requiring the use of wet methods and establishment of dust partitions
  • Disposal of concrete test cell walls utilizing an IC-80 carry-deck crane to transport wet cut walls in approximately 8,000 lb sections; Maven drilled, doweled, and epoxied lifting points into the wet cut wall sections to allow transport by the carry-deck crane
  • Mission-critical nature of facility operations required fast-track scheduling plan; Maven completed all site work inside of the one-week window to meet the Government’s production demands